Khansaheb Sykes were able to assist a key contractor on the Prestigious Yas Island (Abu Dhabi) by overcoming a challenging over-pumping application. This was to control the flow of ‘Dirty Water’ from within a fully operational sewer network during essential refurbishment.
With deep manholes and a high flow rate of over 600m3/hr of ‘Dirty Water’, Khansasheb Sykes had to mobilise a more specialist solution to assist this client as a conventional diesel unit could not achieve the required flow and head on this occasion.
Khansaheb Sykes utilised one of their KE203 8inch Sewage Submersibles to extract the dirty water from the open chamber and pump directly back into the Sewer Network 600m away via a network of 8inch Pvc delivery hoses.
With continued attention on environmental issues such as sound, fuel spillage and emissions, this electric pump used was ideal for this application. As an additional precaution against electric power failure however, a Sykes GP200 (8inch) diesel pump was also connected into the suction line for essential backup.
Khansaheb Sykes’s expertise within the Pumping Sector again ensured that we handled this customers challenging requirement quickly and professionally.
We provide the optimal pumping solutions for any project (no matter how big or how small).
For more information on Over Pumping or our Dewatering, Ground Water Control Services:
Call our Toll free 800 SYKES number, email us or visit our web site:
Tel: [00971] 800 79537
Email: ksykes@khansahebsykes.com
