Wellpoint Dewatering for Office Building in Sharjah, UAE
Khansaheb Sykes has been awarded to sub contract a dewatering system for a major project in Sharjah, UAE. The construction is spread over a huge area, where an office building and two warehouses are being built for commercial purpose.
Considering the large area to be dewatered, our engineers have installed wellpoints in a box formation. They are 200 wellpoints installed on site, which connect to a header pipe which discharges the groundwater 350 meters away from the site location. As the ground is flat and water flow is smooth, booster pumps were not used in between the site and the discharge point.