• Nationwide coverage Nationwide coverage
  • Fast delivery Fast delivery
  • 24-hour service 24-hour service
  • Worldwide locations Worldwide locations

Dewatering Abu Dhabi

Sykes GP100 Dewatering Pumps on Route to Oman

With 160 years of experience in manufacturing and distributing pumps all over the world, Khansaheb Sykes has recently finalized yet another sale contract in Oman. Having the capability to sell and dispatch pumps throughout the Middle East, including UAE, Oman, Kuwait, Saudi Arabia and Bahrain. Khansaheb Sykes’s team ensures that the right equipment is delivered at the right time.

The Sykes GP100 dewatering pumps were ordered by our trading partner in Oman, Al Ansari Trading Enterprise LLC for a client in the government sector in Oman. The dewatering pumps as per the client’s requirement can handle both clean and dirty water containing limited solids.  read more

Dewatering Pumps utilized as a booster pump

Sykes dewatering pumps can be used for numerous pumping applications, one in particular as a booster pump.

The conversion to turn a standard vacuum dewatering pump into a booster pump is straight forward with only a few simple steps needed to convert.

Disconnection of the vacuum system and the placement of a blanking cover to close off the priming system

Khansaheb Sykes is currently carrying out a project in Abu Dhabi for the Over-pumping of a lagoon and boosting the discharge water some 10km away utilizing 20+ dewatering pumps (as boosters). read more

Deep well dewatering system for construction of a New Medical Centre in Abu Dhabi

A newly awarded Medical Centre beginning its construction in the heart of Abu Dhabi was looking for a dewatering solution to control groundwater while it performs a deep excavation for the foundations to be laid.

Khansaheb Sykes was approached to provide a feasible and dependable solution to the project. A complete site survey was done to measure the groundwater level and the soil condition in order to proceed with the appropriate dewatering solution

Due to the deep excavation and fine sands a deep well dewatering system was installed as the conventional wellpoint dewatering technique would be ineffective when the water table needs to be lowered below 7 to 9 meters. Our site engineers have installed 19 deep wells around the plot area to keep groundwater at bay from the project site. read more

Deep well dewatering system for construction of a mall in Abu Dhabi

An upcoming mall beginning its construction on the Al Maryah Island of Abu Dhabi was looking for a dewatering system to control groundwater while it performs a deep excavation for the foundation to be laid.

Khansaheb Sykes was approached to provide a feasible and dependable solution to the project. A complete site survey was done to measure the groundwater level and the soil condition in order to proceed with the appropriate solution for drying the ground.

 Due to the deep excavation and fine sands a deep well system was installed as the conventional wellpoint solution would be ineffective when the water table needs to be lowered below 7 to 9 meters. Our site engineers have installed 36 deep wells around the huge area to keep groundwater at bay from the project site. read more