Twin Basement Hotel Project- Deepwell Dewatering
A leading contractor has recently contacted Khansaheb Sykes to perform dewatering for the Two Basement Hotel Project in Al Barsha, Dubai.
After an initial site survey and ground inspection by our dewatering specialists, the system of deepwell dewatering was advised by our engineers. The installation of deep wells began in the first week of January 2014, where currently 8 deep wells are installed and running successfully.
As the shoring system is temporary H-beam pipe, and considering non watertight shoring system, Khansaheb Sykes have adopted two deep well dewatering systems for the construction- 3 deep wells are installed outside the plot limit from the existing ground level and 5 deep wells are installed inside the plot limit at a reduced level, just above the water table.