Dewatering solution for construction of a Sea Intake Structure
Khansaheb Sykes was approached to provide a feasible and dependable solution to the project. A complete site survey was done to measure the groundwater level and the soil conditions at site in order to proceed with the appropriate dewatering solution.
Due to the deep excavation and hard ground conditions, a conventional deep well dewatering system would have been ineffective. Our site engineers therefore installed 35 electrical drainage dewatering pumps, strategically placed around the excavation area to control the flow of groundwater entering the construction site.