Posts Tagged ‘dewatering operations’

Khansaheb Clears The Air

Thursday, July 1st, 2010

Khansaheb Sykes, the leader in dewatering and ground water control within the UAE has introduced into its hire fleet Ventilation Fans. These ventilation / extraction fans are robust high powered fans, and they are used with ducting to assist in the removal of dangerous fumes, dust particles and vapours. The larger units can also be linked to heaters, boilers, and chillers to distribute warm or cool air over large areas.

Good ventilation is not only essential to creating a comfortable working environment, it can also be a Government and Health and Safety requirement. Our extraction and ventialation fans mean you have fresh air circulating as and when you need it.

The Ventilation Fans are ideal for the removal of welding fumes, demolition, tank-cleaning, agriculture, sewer maintainance, digging of polluted ground, tunnel construction, construction and painting.  The units are ideal for supplying fresh air into confined spaces, the FV900 has a maximum air flow of 16,500 m3/hr and  the FV900 dimensions are 1,170 x 1,230 x 1,500 mm.

 

Ventilating Fans

Ventilation Fans

 

 

Ventilation Fans

Ventilation Fans

Khansaheb Sykes Increases It’s Pump Range

Thursday, July 1st, 2010
SP80 Submersible Pump Hire

SP80 Submersible Pump Hire

Khansaheb Sykes the leader in Dewatering and Ground Water Control within the UAE has introduced the Pumpex SP range of electric submersibles into its hire fleet to compliment the companies’ range of Wellpoint Dewatering and Ground Water Control Pumps.

The Pumpex SP range of electric submersible sludge pumps are ideal for pumping sludge, water with large sludge content and contaminated liquids. These light, portable hard wearing pumps are compact in design, reliable and simple to install and maintain, they are capable of delivering heads of 32meters and a capacity of 30 litres per second.

The larger units range from 80mm to 300mm, the amount of material that the sewage pumps can shift depends on the size of the pump, the constitution of the material, and the addition of an impeller and the particular application.

Working in conjunction with our vast Dewatering and Ground Water Control projects within the UAE, a number of these pumps have already been utilised on Sewage projects at Yas Island. Here the customer required a high head electric submersible pump capable of pumping dirty water and with the capacity of discharging over 100 metres.

From Pontypridd to Abu Dhabi!

Friday, December 4th, 2009

Jamie Smele has recently been promoted from the role of depot manager of the Andrews Sykes Hire, Pontypridd branch, to take on the role of manager of the Khansaheb Sykes operation in Abu Dhabi.

Jamie joined the Andrews Sykes Group two years ago and has gained extensive experience in pump hire and air conditioning hire whilst managing our operations in South Wales.

After an initial trial period, Jamie has now relocated to the UAE, where he will manage our pump hire and dewatering operations in Abu Dhabi. Working alongside the Khansaheb Sykes General Manager, Dave Crawford, Jamie will add considerable strength to our local operations as the region continues to grow and develop.

Khansaheb Sykes LLC is a subsidiary of the Andrews Sykes Group and has been operating throughout the Middle East for over 25 years.

Jamie far left with Dave Crawford and local Sales Engineer, Arman Singh