Sykes Pumps, not just for dewatering applications

Khansaheb Sykes was approached to provide a feasible and dependable solution to a project at one of the UAE’s busiest airports. A complete site survey was carried out to access the project and for Khansaheb Sykes R&D department to provide the best solution using a Sykes dewatering pump.

The solution for Fire Safety Training was to provide a Sykes GP150 6inch dewatering pump built as a booster pump powered by Kirloskar Air cooled engine supported by a Murphy Control Panel thereby allowing the pump to run in an Auto start / stop function controlled by discharge water pressure.   read more

Electric Motor Driven Road Towable Dewatering Pumps by Khansaheb Sykes

Khansaheb Sykes the Middle Eastern arm of “Sykes Pumps” have been providing the most reliable and efficient dewatering pumps throughout the Middle East for over 4 decades, making us the leading dewatering pump supplier in the MENA region, with continued support of a network of distributors throughout the GCC.

Dewatering Pumps are commonly fitted with Diesel Engines, however, a Dubai Government Department requested bespoke Sykes 8” dewatering pumps on a road towable trailer with an Electric Motor as the prime mover. read more

Khansaheb Sykes and engine partner ‘Lister Petter UK’ goes from strength to strength

Sykes Pumps and its engine partner Lister Petter Engines UK, continue their strong bond.

Following on from a successful pump sales trading period in 2018, Khansaheb Sykes have taken additional engine deliveries from Lister Petter UK, namely the TR3 Air Cooled engine. From received boxed engines to complete pump build in less than a week

Khansaheb Sykes new pump build division completed an order of 10 x Genuine Sykes WP150 -60 dewatering pumps powered by Lister Petter TR3 Engines for an Oil & Gas client based in Abu Dhabi in the agreed time frame and just in time for the rainy climate.  read more

HOT OFF THE PRODUCTION LINE

Newly fleeted Sykes GP150 dewatering pumps heading out for a Ballasting Project in Dubai, not sure if the paint had even dried!

The Sykes dewatering pumps can be utilized on several applications, not only as a WellPoint dewatering pump. With an open impeller design they are suitable for moving sewage water, as booster pump on dewatering projects where the discharge point is not in close proximity to the project site and for general pump hire.

On this occasion 10x Sykes GP150M dewatering pumps are being used on an off -shore ballasting application. read more

Khansaheb Sykes delivers to a new trading partner

Khansaheb Sykes are known to provide the most reliable and efficient dewatering pumps within the pump industry.

Our presence in the Middle East spans over 4 decades and the fact that Sykes Pumps celebrated its 160th year throughout 2017 into 2018 confirms that the Sykes branded pumps are leading the competition as a dewatering pump supplier in the MENA region

To Further cement our presence, Khansaheb Sykes are in the final states of securing a trading partner in Yemen, who will offer the full scope of Sykes Dewatering Pumps. read more

Deep Well Dewatering for Sewage Treatment Plant Expansion

Another great aerial photo of a Khansaheb Sykes deep well dewatering project in Dubai.

Deep Well Dewatering activities so that excavation can commence for the installation of pipes for a newly expanded Sewage Treatment Plant. Great job by all involved within the project due to the Ground conditions at the project site meant that a deep well dewatering design followed by the installation of a French Drain system below the final excavation was the only dewatering solution available.

Khansaheb Sykes Design Team and operational staff worked extremely hard to install and maintain this bespoke dewatering solution to ensure we maintained a dry site at the project. read more

Shore Line Dewatering

One of the leading contractors in Abu Dhabi, UAE, was looking for a professional dewatering contractor to support their construction site which was situated close to sea shore, they approached Khansaheb Sykes as a trusted dewatering solutions provider.

With over 40 years of expertise as a leading dewatering contractor in the Middle East, we left no stones unturned for this project, which involved installing a Deep Well dewatering system with wells drilled and installed to a depth of 35 meters with the well spacings close together due to the closeness of the project to the sea shore. read more

Deepwell Dewatering near the border of Dubai.

Khansaheb Sykes was approached to install a deepwell system for the construction of a new sea water intake pumping station near the border of Dubai, UAE.

The project required a pumping test to identify the actual soil properties to enable the calibration of the proposed dewatering system design and offer a more cost effective solution with strategically placed deep wells.

The deep well system design utilizes a series of wells installed around the perimeter of the construction offering a non-intrusive solution. read more

Deepwell Dewatering to build one of the UAE’s most prestigious bank.

When one of the leading contractors in Abu Dhabi, UAE, were looking for a professional dewatering contractor to support their construction of a prestigious bank, they approached Khansaheb Sykes as a trusted dewatering service.

With over half a century of expertise as a leading dewatering contractor in the Middle East, we left no stones unturned for this project, which involved a 15 meter depth and 600 linear meters to be dewatered.

Our experienced site engineer surveyed the site, and suggested the contractors to consider the most efficient and cost effective deep well dewatering method. read more

Khansaheb Sykes Dewaters at Al Wasl, Dubai, UAE

Khansaheb Sykes was awarded as the Dewatering Sub Contractor for the upcoming collection of residential and retails units at the well-known Al Wasl Road, Dubai, UAE. The total land area to be dewatered is 682,000 square feet and the total built up area is 1.17 million square feet. The project is expected to finish by this year (2014).

The engineers at Khansaheb Sykes, offered to dewater the site with the age old, economical, flexible and stable well point dewatering system where a number of wellpoint tubes were installed, protected by gravel filtration tube, to collect groundwater efficiently without any gravel and large particles. read more